4 Axis Machining Precision Cnc Milling AL Components Automatic Production Line Accessories
4 Axis Machining Precision Cnc Milling AL Components Automatic Production Line Accessories Description
Cnc Machining Or Not: | CNC Machining | Material: | Steel/aluminum/brass |
---|---|---|---|
Surface Treatment: | Painting/powder Coating/anodized | Process: | Cnc Tuning,milling,cnc Machining |
Application: | Industrial Equipment,Auto Part/mechanical Parts/Electronic Parts | Product Name: | Customized OEM Custom Steel Cnc Precision Milling Jig Fixture |
High Light: | cnc milling service, metal machining services |
Automatic production line accessories 4 Axis Machining Machined AL Components parts
Semiconductor Machinery 4 Axis Machining Machined Stainless Steel Components
Product Details:
Automatic production line accessories 4 Axis Machining Machined AL Components parts
Components Semiconductor Machinery parts Ship accessories Bridge structural parts
Material: AL6082 Concentricity:0.03mm Rugosity:Ra1.6
Tolerance:0.01-0.05mm L*W*H(mm)=40mm*30mm*25mm
Main Products Display:
Metal:2024,2A12,5052,6020,6061,6063,7075,45#,SKD11,DC53,SUS304,SUS136.SKD11,DC53.
Machine:CNC processing center,Wire cutting macine,Milling machine,Grinding machine,EDM.Surface treatment:nickel plating,chrome plating,anodizing.
Purpose:Communication equipment,Testing equipment,Electronics equipment,agricultural
machinery,electrical appliances products,Generator parts,Bathroom Parts,Ship accessories,
Electric Tool Parts,Petroleum Mining Machinery Parts,Bridgestructural parts,Microscope Bracket Parts,
Juice extractor parts,Mountaineering Equipment Parts,Sports Equipment Parts,Fitness Equipment Parts,
Photographic equipment parts,Furniture Hardware Parts,Mower Parts
Processing all kinds of metal and plastic matenrials with the change of the times,the materials chosen by customers are changing constantly,in order to meet the different material needs of customers,we have accumulated a very rich and wide range of process characteristics and technical know-how of mechanical processing of metal and non-metal materials through continuous technological innovation and research and development. | |||||
Steel | Stainless steel | Aluminum | Copper | Plastic | Surface treatment |
1.2344 | SUS303 | A1050 | C1020 | PC | High speed sand blasting |
SUJ2 | SUS304 | A2017 | C1100 | PP | Anodic oxidation |
1095 | SUS316 | A2024 | C145 | MC | Nickel plating |
1212 | SUS403 | A5056 | C147 | POM | Titanium plating |
1566 | SUS416 | A5052 | C5191 | ABS | Gold plating |
S355 | SUS420J2 | A6020 | C1220 | PVC | Silver plating |
C22 | SUS430 | A6061 | C360 | PEEK | Chrome Plated |
C45 | SUS630 | A6063 | Others | PMMA | Blacking |
F125 | 17-4PH | A6082 | Bakelite | flame plating | |
F141 | A7075 | Teflon | Abrasion | ||
CK45 | Others | Others | Chemical polishing | ||
Others | Others |
Main Machining Machinery Display
Continuing to invest heavily in our facilities , we aim to bring you the most reliable,efficient and affordable metal component.our highly skilled and professional workforce is dedicated to satisfying the individual needs of all our customers and various markets the serve. | ||
Processing type | surface treatment | Heat Treatment |
CNC Machining | nickel plating | treatment |
Multi-Axis CNC Machining | Gold plating | Passivation |
CNC Turning Service | silver plating | Stress Removal Passivation |
CNC Milling/Turning Multiple | chrome plating | Conditioning treatment |
EDM | Titanium plating | quenching treatment |
Thread Processing | Blackening treatment | Vacuum quenching treatment |
wire cutting | anodizing | High cycle quenching |
drilling | Sandblasting | Carburizing treatment |
Gear working | Chemical grinding | salt-bath nitrocarburizing |
stamping | dacromet | Tempering |
laser cutting | Annealing treatment | |
Mechanical Parts Design | ||
Parts Assemble |
Quality policy
To focus on "customer satisfaction" as the premise condition of core business tenet, company personnel
to promote lean production management mode. With the evolution and development of precision metal
parts manufacturing industry chain, we recognized that the industrial chain of enterprise survival based
on quality and product services to guests. To this end, we continue to introduce foreign high-precision
processing and testing equipment; product process simple optimizing continuously; constantly improve
product quality standards and other aspects of enterprise management innovation, the company has won
high praise and affirmation from customers.
FAQ:
Q1: Can XINYA make technical drawings for my design?
A1: We can provide a drawing for Manufacturing review according to your current 2D,3D CAD draft
or a sample offered by you. We of course will sign and adhere to any non-disclosure or confidentiality
agreement if your design is confidential.
Q2: How long can I get a quotation?
A2: We respond within 24 hours when receive an RFQ. Normally a quotation will take 1-3days.
If there is delayed, we will notify you as soon as possible.
Q3: How quickly can I get my parts?
A3: Lead times is normally 2-3 weeks when get your complete 2D and 3D CAD models from the
order date. Complex parts requiring or large quality order will take longer.We are able to be
competent for some urgently needed project as well.As for shipping, most of our shipments are
via Express or by Air, which will take 3-7days to your door.
Q4: What after-sales service can I get for any unsatisfied parts I receive?
A4: To ensure high quality of our machined components, we have detailed quality control system
and full-equipped measuring equipments. We guarantee all the dimension based on the information
provided by you. We have confidence in our ability to meet and exceed any reasonable expectations.
Q5: Environmentally friendly materials have been used, and how does it work?
A5: The material corresponding to RoHS regulation and reach in Europe is available and is actually
used. For each material, if you have a request to use the material for the environment from customers,
we propose a suitable material and process it based on the decision.
Q6: Is the material readily available?
A6: Depending on the material. The procurement / T is somewhat different, and most of the materials
can be delivered on the next business day. However, it may be difficult to incorporate materials in such
cases because it is often disturbed by the price of materials and the effect of social conditions.
Q7: Worried about the scars on delivery, etc?